Navig8 Bolsters Pool Fleets
zoomConti Selenit January has been a busy month for Navig8 Group’s shipping pools as they bolster ranks with new units. A total of nine units have joined Navig8s pool fleets this month. The most recent additions saw a newbuild 49,000-DWT Navig8 Victoria being delivered from Hyundai Vinashin shipyard. The chemical carrier is set to join the Chronos8 Pool. Genco Shipping joined the Pan8 Pool with the 1999-built bulk carrier Genco Leader. The pool was joined earlier this month by bulk carrier Conti Selenit, built by Penglai Zhongbai in 2010. The 64,000-dwt bulker Vela, built in 2014 by Jinagsu Hantong, joined the Ultra8 Pool. Another vessel from the same builder joined the same pool, the 2014-built Apus. In the first half of January four more units, two chemical tankers and two dry bulk carriers have joined Navig8 Group’s shipping pools.