Vladimir **********
Chief Engineer - Russia, Kaliningrad
Sea service (years): 5-10
- Tel. No.

- Mobile


- Skype

Certificates of competency
| Type | Number | Valid until | Issued by | Issue at |
|---|---|---|---|---|
| Chief engineer – 3,000 kW propulsion power or more | 18.02.2025 | 17.07.2020 | Russia | |
| Ships Electrical Engineer | 18.02.2025 | 17.09.2021 | Russia |
Ready for positions
| Position | Vessel Type | Salary per month | Duration of contract (Months) |
|---|---|---|---|
| 1st Assistant Engineer | Any | |
4-6 week on / 4-6 week of |
SEA SERVICE RECORDS
| #: | From - Till: | Vessel Name: | Flag: | DWT: | Enginie: | BHP: | KW: | GRT: | Type of vsl: | Position: | Company Name: |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 15.07.2022 - 12.08.2022 | Gibraltar | N/A | MAN | 2x3475=6950 | 2x2555=5110 | 2298 | MRSV | Chief Engineer | ||
| 2 | 13.10.2021 - 10.11.2021 | Bahamas | N/A | MAK | 2x3625=7250 | 2x2666=5330 | 2447 | MRSV | 2nd Engineer | ||
| 3 | 11.09.2021 - 30.09.2021 | Singapore | N/A | Bergen | 2 x 3481 = 6962 | 2 x 2560 = 5120 | 3963 | Seismic vessel | Chief Engineer | ||
| 4 | 17.06.2021 - 12.07.2021 | Norwegian International Register | N/A | Wartsila | 2 x 7672,5 = 15345 | 2 x 5520 = 11040 | 2598 | MRSV | 2nd Engineer | ||
| 5 | 23.12.2018 - 19.05.2021 | Panama | N/A | Mitsubishi | 2 x 1332.5 = 2665 | 2 x 980 = 1960 | 1177 | Offshore Supply vessel | Chief Engineer | ||
| 6 | 30.01.2017 - 10.11.2018 | Panama | N/A | Wichmann | 1156 / 730+647 | ME 850/ AQM 536+476 | 988 | Standby-safety vessel | Chief Engineer | ||
| 7 | 17.05.2015 - 14.01.2017 | Gibraltar | N/A | Wichmann | 1200/500 | ME 882 / AQM 368 | 612 | Standby-safety vessel | Chief Engineer |