Work Scope:
- Installation of Jackets
- Installation of Transition Pieces (TPs)
- Operating a Liebherr crane (1,500-ton capacity) on offshore wind projects
Requirements:
- Main Crane Operator Offshore Stage 2 or Stage 3
- Proven offshore experience (Jack‑Up / Heavy Lift)
- STCW Basic Safety
- GWO Working at Heights
- Valid Maritime / Offshore Medical
- HUET, CA‑EBS
- International Passport
- Seaman’s Book (SMB)
- Permit to work in the EU Location: Worldwide
Job added by iPS Dubai Powerful People